Audit of a multi-site PV installation
Verification of protection, earthing, cabling, strings and documentation.
POWERGO · ENERGY FOR BUSINESS AND HOMES
We analyse your bills and measurements, then combine SVG/ASVG compensation, BESS storage, photovoltaics, EV charging and EMS into one system that fits the site.
Measurement and analysis · Design, installation, service · Poznań and all of Poland
RCEm — the monthly settlement price for prosumers in net-billing; Crk — the average competitive-market price published by the Polish regulator (URE).
For information only; not advice.
THE SOLUTION DEPENDS ON THE PROBLEM
You do not need to know the equipment. Start with the problem you want solved.
Work out the charge from your invoice and check whether compensation pays off.
Check the chargesCosts, contracts, grid operator, power quality, PV and storage.
Solutions for businessFarm self-consumption, estate infrastructure and local balancing.
For agricultureEstates and local models: see solutions for housing estates.
Energy flow map — technical illustration
INTERACTIVE POWERGO MAP
Photovoltaics, energy storage, SVG, EV charging and EMS work best when the design covers the whole site. Pick a point on the map or a topic from the list.
WHY POWERGO
We design and build in-house — operation and supervision licences, no subcontracted electrical work.
A power-quality analyser on site: reactive power, harmonics, voltages, load profile. Sizing from data, not from a catalogue.
Design, supply, installation, commissioning, grid-operator filing and service — one contractor, one phone number.
We compare the invoice and measurements after the project with the assumptions. If something is off, we fix it — that is our job, not yours.
FROM PROBLEM TO RESULT
Costs, contracts, grid operator, measurements and investments under ongoing care.
Energy management serviceReactive power, harmonics, 253 V, protection and PV audits.
Book a measurementFROM REAL SITES
Verification of protection, earthing, cabling, strings and documentation.
Measurements, SVG compensation sizing and parameter checks after commissioning.
Invoices, contracts, grid operator, investments and result control in one process.
THE POWERGO PROCESS
What costs what, and why?
What is happening on site?
Which solution makes sense?
Design, supply and commissioning
Did we get the planned result?
CALCULATE AND CHECK
Start with the data on your invoice and verify the reactive power charges.
CheckKNOWLEDGE CENTRE
EQUIPMENT WITH TECHNICAL CONTEXT
Equipment we install and service ourselves — with datasheets and sizing for your site.
FREQUENTLY ASKED QUESTIONS
Usually with an invoice and a short conversation.
Ask a questionTHE FIRST STEP COSTS NOTHING
Send an invoice or describe the problem.